For this piece of work, we were asked to install new product training rooms for Whirlpool in Peterborough.
We are installing a demountable 75mm partition that’s 30 minutes fire rated.
by bossblount
For this piece of work, we were asked to install new product training rooms for Whirlpool in Peterborough.
We are installing a demountable 75mm partition that’s 30 minutes fire rated.
by bossblount
by bossblount
by bossblount
This project in Burton Latimer was all about restroom re-vamps.
We did the work for a commercial customer, transforming their bathroom after the flooring had failed.
Small changes to a room can make the biggest impact, as you can see from the before and after photo.
What a fantastic improvement!
by bossblount
What a treat the team at Blounts have had with this project.
Working in a beautiful, newly built farm shop in the Deepings.
We helped our client lose the echo that was present in their building by installing ceiling baffles and wall panels. We blended the wall panels so that they fitted nicely with their interior.
Installation took 2 days from start to finish!
by bossblount
They wanted to make the area more usable, but with a caveat that the area is also a fire escape. This is a very important factor when planning the division of offices or commercial areas.
Incorporating a corridor into the design would have made the area too small and not practical, so instead we suggested a movable wall solution.
This gave the client more scope for the area than they originally thought; having either one large or two smaller meeting rooms. They are 45db sound rated with a pass door and with no issues regarding the fire escape route.
This is a “win win” for the client.
The panels are melamine faced for easy cleaning and they stack to the wall when not in use.
Our folding wall solutions can be either top hung or floor mounted as site dependant.